不支持Flash
QUALITY CONTROL TECHNOLOGY DISCUSSION
 
CAPABILITY>   Prototype    Design    Assembly    Tackle Key Problem    Other
ABOUT US
Profile
History
SERVICES
Mold Making
Injection Molding
Die Casting
QUALITY CONTROL
Quality Department
Inspecting Room
Cerificate Number:Q31061240
 
Current Location : CAPABILITY > Assembly  
Assembly

       Assembly is a significant phase in the production tooling. It should be planed carefully, carried out seriously, and monitored strictly.
       Many programs will be defined clearly and fixed as a standard. In addition, the SDCA (S: Standard, D: Do, C: Check, A: Action) circular working program will be promoted in the process. With the series of standards in the working place, with which the workers are obeying, there are no exceptional accidents occurred in the process. The next step is to adjust the actuality and to improve the standard to a higher level so that the PDCA (P: Plan, D: Do, C: Check, A: Action) circular working program can be promoted.
       The seven activities for spot costs reducing procedure:
        1. improve the quality
        2. enhance the productivity
        3. reduce the stock
        4. shorten the product line
        5. cut down the close-down time of the machine
        6. lessen the space
        7. reduce the lead-time

        Through improving the quality of the working process, the phenomenon of badness and rework is reduced, the production efficiency is improved and the production costs are reduced. It guarantees that your products can go into the marketplace in the shortest possible time.

 

CAPABILITY>   Prototype      Design      Assembly       Tackle Key Problem       Other
Add: ZengTian Industry Area, XinAn District, ChangAn Town, DongGuan,GuangDong, China   Zip Code: 523880
Tel: + 86-769-81559155 Fax: +86-769-81559100
Email:marketing@sbd-mold.com Web:http://www.sbd-mold.com